What is the job of a Construction Coordinator?
The job of a construction coordinator consists of organizing a building project so that it moves forward in an orderly way: that the crews, materials, permits and drawings are where they need to be when they are needed. It is a liaison position between the people who design the project, the people who carry it out on site and the people who pay for it or oversee it. It can be in buildings, houses, roads or other infrastructure works.
A typical day starts with a walk around the site to see what was done and what is still pending, followed by a short meeting with the foremen of each work area. Then deliveries of materials are confirmed, drawings and changes are reviewed, questions from contractors are answered and the schedule is updated. Part of the day is spent on site, in a hard hat and boots, and part in the office or in a site cabin, with a computer, a phone and paperwork.
Typical tasks
- Following the progress of the work and comparing it with the planned schedule.
- Coordinating contractors and subcontractors so that their work does not get in each other's way.
- Ordering materials and equipment and confirming their delivery on the dates needed.
- Reviewing drawings, specifications and changes, and passing them on to the people who build.
- Recording progress, incidents and decisions in reports and site logs.
- Checking that safety and quality rules are followed on site.
- Preparing cost and progress information for management or the client.
Subjects and content usually covered
- Technical drawing and reading architectural, structural and services plans.
- Construction materials and processes: concrete, steel, masonry and finishes.
- Project planning: schedules, critical paths and resource scheduling.
- Costs, budgets and expense control on a building project.
- Occupational health and safety on construction sites.
- Contracts, building regulations and permit procedures.
- Spreadsheets and planning and computer-aided design software.
Usual duration and type of training
It depends on the route. Technical training in construction usually lasts 2 to 3 years, and a university degree in civil engineering, architecture or construction takes 4 to 6 years. It is also common to arrive after several years of experience on site, together with short courses in planning or safety lasting a few months. The length of training and the names of the qualifications vary by country.
How you get there and what is usually required to practice
People get there by several routes: from a related university or technical program, or from the site itself, starting as a helper, technical assistant, foreman or supervisor and gradually taking on more coordination. The first position is usually a support role, alongside someone with more experience.
In general there is no license specific to this job, but knowledge of site safety is expected and, depending on the country, certificates for working at height or other risky tasks. The person who signs drawings or technically directs a project usually needs the degree and the professional registration of an engineer or architect, which depends on each country.
Skills that help
- Organizing several tasks and crews at once, with a clear order of priorities.
- Reading drawings and checking on site whether what has been built matches them.
- Speaking directly with workers, contractors, suppliers and clients.
- Negotiating deadlines and changes when something does not go as planned.
- Keeping tidy records of progress, orders and agreements.
- Spotting risky situations on site and warning people in time.
Career paths and job opportunities
- Construction companies that build buildings and housing.
- Infrastructure works: roads, bridges, water and sanitation networks.
- Real estate developers that hire and follow their own building projects.
- Renovation and building maintenance companies.
- Project or construction management offices that supervise on behalf of a client.
- Industrial and commercial businesses that build or expand their facilities.
What you are not always told
- A large part of the work is outdoors, in sun, rain, dust and noise, and days can start very early.
- When there is a delay, pressure usually comes from several sides at once: the client, the contractors and management.
- Sites can be far from the city, and sometimes this means traveling or staying away from home.
- The first position is usually a support role, with a lot of record keeping and paperwork, and responsibility arrives gradually.
- A coordination mistake can stop several crews, so people learn to check twice.
How the field is changing
Construction sites are adopting three-dimensional digital models, drones to check progress, phone apps to record tasks and software that matches the schedule against costs. This reduces paper and makes a large part of the work about organizing and reading information. There is also more attention to materials with lower environmental impact, to the energy efficiency of buildings and to stricter safety rules, and more parts are made off site and assembled on site.
Want to know if this is the right career for you?
Take the free vocational test with 5 scientific methods — CHASIDE, Holland, Big Five, MMMG and VAK — to get your personalized profile. You can also explore all university careers or learn about the scientific methodology.