What is the job of a Construction Liaison (Development)?
The job of a construction liaison in development consists of acting as the connection point between the team that promotes a real estate project (the side that provides the land, the money and the decisions) and the team that builds it: the construction company, the site management, the designers and the suppliers. The aim is that what was planned on paper and what happens on the site stay aligned on schedule, cost and quality.
A typical day combines office work and visits to the site. In the morning, progress, the current plans and the changes requested by either side are reviewed. Then the site is visited to see how the work is going, the person in charge of the site is consulted and problems are noted down. At the end of the day a report is written for the development team, schedules are updated and architects, engineers or suppliers are asked how to solve whatever came up.
Typical tasks
- Visiting the site regularly and comparing what has been built with the plans and the schedule.
- Passing on to the construction team the decisions and changes requested by the development side.
- Bringing the project's promoter information on progress, delays and extra costs.
- Reviewing change requests and payment orders to contractors together with the cost department.
- Coordinating meetings between architects, engineers, contractors and suppliers.
- Recording in writing the agreements, incidents and handovers of each stage.
- Supporting the follow-up of permits, inspections and the final acceptance of the building work.
Subjects and content usually covered
- Technical drawing and reading architectural and engineering plans.
- Materials and building processes.
- Project planning: schedules, stages and critical paths.
- Budgets, construction costs and spending control.
- Construction contracts and the basics of building law and regulations.
- Health and safety on construction sites.
- Fundamentals of real estate development and feasibility analysis.
- Digital tools: spreadsheets, planning software and 3D building models.
Usual duration and type of training
There is no single training route. Related university degrees, such as civil engineering, architecture, construction or construction management, usually take 4 to 6 years. Technical programs in construction or building usually last 2 to 3 years. There are also short courses of 3 to 12 months in project management or site control, which are added to experience. Everything varies depending on the country and the institution.
How you get there and what is usually required to practice
This is a job that people reach by several paths. Many come from architecture, civil engineering or construction and start as assistants on a site or in a technical office. Others start from a technical program and years of experience as a site engineer, supervisor or project administrator, and later move over to the development side.
In general there is no license specific to this position. A degree in architecture or engineering may be asked for, and in some countries a professional registration is needed to sign technical documents. Previous experience on site and a basic command of plans, budgets and planning software are usually asked for.
Skills that help
- Reading plans and understanding what is being built and in what order.
- Explaining technical matters in simple terms to people who make financial decisions.
- Negotiating agreements between parties with different interests, such as deadlines, costs and quality.
- Organizing time to handle visits, meetings and reports at once.
- Noting down agreements, changes and problems accurately to avoid misunderstandings.
- Staying calm when giving bad news or when there is a conflict on the site.
Career paths and job opportunities
- Development and real estate companies that promote buildings and housing estates.
- Construction companies that work with clients who develop their own projects.
- Project management or project administration offices.
- Investment funds and firms that build or renovate properties.
- Public bodies that promote housing or infrastructure works.
- Retail or industrial chains that build their own stores or plants.
What you are not always told
- A large part of the job is being in the middle: both sides may ask for opposite things, and the relationship with both has to be kept up.
- Site visits mean dust, noise, heat or cold, and wearing a helmet and safety footwear.
- Delays and cost overruns are common, and the pressure over deadlines often falls on the person who passes on the information.
- Decisions made by phone or by word of mouth can cause conflicts later, so a large part of the day goes into documenting.
- Getting a first position in development is usually harder than getting one on site, and many people go through other construction roles first.
How the field is changing
Digital building models, which bring together the plans of all the specialties, make it possible to detect clashes between installations before building. Tracking with photographs, drones and phone apps speeds up progress control. Requirements are also growing for energy efficiency, for materials with less environmental impact and for traceable documentation, which adds checking and recording tasks to this position.
Want to know if this is the right career for you?
Take the free vocational test with 5 scientific methods — CHASIDE, Holland, Big Five, MMMG and VAK — to get your personalized profile. You can also explore all university careers or learn about the scientific methodology.