What is the job of a Geotechnical Engineer?
The job of a geotechnical engineer consists of studying the soil and rock on which something is going to be built, or into which something is going to be dug, in order to decide how they will behave once a building, a road, a bridge, a tunnel or a dam is placed on or in them. With that information, the engineer helps define which type of foundation is appropriate, how steep a slope can be without risk of sliding, or how to hold up a deep excavation.
A typical day combines office and field. In the office, the engineer reviews drilling reports, laboratory results and drawings, and does calculations and models in specialized software. On other days the engineer visits the construction site or study area to see how the boreholes are drilled, note what shows up in the excavation and check whether the real ground matches what was expected. The result is usually a report with recommendations that the people who design and build the project then use.
Typical tasks
- Planning the investigation of the ground: how many boreholes or test pits to make, where, and how deep.
- Supervising the collection of soil and rock samples and describing what is found in each layer.
- Interpreting the results of laboratory tests and of tests carried out in the field.
- Calculating how much load the ground can carry and estimating how much a structure will settle over time.
- Analyzing the stability of slopes, retaining walls and excavations, and proposing how to reinforce them.
- Writing reports with conclusions and design recommendations for the rest of the project team.
- Checking during construction that the conditions found match what was predicted, and adjusting the design if they do not.
Subjects and content usually covered
- Mathematics, physics and statics, as a common base of engineering.
- Geology applied to engineering: rock types, soils and groundwater.
- Soil mechanics: strength, compressibility and the flow of water through the ground.
- Rock mechanics and tunnel excavation.
- Design of shallow and deep foundations, such as piles.
- Stability of slopes and retaining structures.
- Behavior of soils during earthquakes and other vibrations.
- Calculation software and numerical modeling of the ground.
Usual duration and type of training
There is no single length, because this job is reached after studying a related engineering field, above all civil engineering. That university degree usually takes 4 to 6 years, depending on the country. Many people then add a graduate program or courses in geotechnics, lasting 1 to 2 years, and several years of practice working alongside more experienced professionals. The names of the qualifications and the time needed vary from one country to another.
How you get there and what is usually required to practice
The most common route is to study civil engineering and move toward geotechnics through elective subjects, a final project on the topic or a graduate program. People also arrive from geological engineering, mining engineering or geology, and later move closer to the design side.
In many countries, signing reports and projects requires the university degree and a registration or professional license granted by the relevant authority or professional board. The first years are usually spent as an assistant or junior engineer, doing fieldwork, laboratory work and calculations that a more experienced person reviews.
Skills that help
- Interpreting data from boreholes and tests to form an idea of ground that cannot be seen.
- Doing calculations with judgment, knowing when a result does not make sense.
- Explaining a technical conclusion clearly in writing to the people who design or build.
- Working in the field with a helmet and boots and good safety habits, in places with mud, dust or noise.
- Using calculation, modeling and technical drawing software.
- Coordinating with structural, hydraulic, surveying and construction teams.
Career paths and job opportunities
- Engineering consulting firms that carry out soil studies and design.
- Construction companies that build buildings, roads, bridges, tunnels and dams.
- Soil and materials testing laboratories.
- Mining companies, which study the slopes of open pits and waste storage sites.
- Public agencies for works, transport and the management of landslide risks.
- Universities and research centers.
What you are not always told
- Much of the information about the ground is incomplete: it is known only from a few drilling points, so there is always uncertainty and decisions have to be made with it.
- Fieldwork can be in remote places, in rain, heat or cold, and sometimes with long hours.
- When something goes wrong on a project, such as settlement or a crack, the ground is often checked first, and that brings pressure and responsibility.
- The first years are usually full of laboratory work, fieldwork and repetitive calculation, and the important decisions are reviewed by other people.
- Project deadlines can be tight, and soil studies are sometimes requested late, when the design has already moved forward.
How the field is changing
Modeling software makes it possible to represent the ground in three dimensions and to test many situations more quickly. Drones, sensors and measuring equipment are used to record the movement of the ground during construction, and there is more attention to the effect of extreme weather, heavy rain and earthquakes on slopes and foundations. Recycled materials and soil improvement techniques that reduce environmental impact are also being studied, and technical standards are often updated to include these aspects.
Want to know if this is the right career for you?
Take the free vocational test with 5 scientific methods — CHASIDE, Holland, Big Five, MMMG and VAK — to get your personalized profile. You can also explore all university careers or learn about the scientific methodology.