What is a Surveying Technician training program?
The training program in surveying prepares technicians who measure land and show it in plans and models. Using measuring instruments and drawing and calculation software, they work out where each point on a piece of land is, what shape the land has, how far apart things are and at what height they sit. This data is the basis for designing and building roads, buildings, water networks, bridges or housing developments, and also for marking out property boundaries.
A typical day combines fieldwork and office work. In the field, the crew arrives at the site with the equipment, sets up the instruments at different points, takes the measurements and carefully notes the reference points. In the office, the data is downloaded, checked, calculated and turned into plans, profiles and tables of coordinates. When a construction project is under way, the technician also goes back to the site to mark with stakes or signs where each part of the design is to go.
Typical tasks
- Preparing and checking the measuring equipment before going out to the site.
- Carrying out surveys to record the position and height of points on a piece of land.
- Marking on the ground the position of axes, corners and levels shown in the plans of a project.
- Downloading and processing the measured data with calculation and drawing software.
- Drawing plans, profiles and contour lines from the measurements.
- Writing down in field books or digital records each measurement and each condition of the land.
- Supporting the surveyor in charge with calculations and with the delivery of results.
Subjects and content usually covered
- Applied mathematics, geometry and trigonometry.
- Basic surveying: measuring distances, angles and differences in height.
- Technical drawing and computer-aided drafting.
- Calculation of coordinates, areas and volumes of earth.
- Satellite positioning systems and total stations.
- Mapping and reading plans.
- Photogrammetry and drone surveys, depending on the program.
- Basics of land registry, land ownership and building regulations.
Usual duration and type of training
Technical training in surveying usually lasts 2 to 3 years, with a large share of practice in the field. In some places there are shorter programs, of 6 months to 1 year, that cover the use of equipment and the drawing of plans. The length, the name of the qualification and what it allows its holder to do vary from one country to another, and some programs have classes in the morning, in the afternoon or at times meant for people who already work.
How you get there and what is usually required to practice
People usually arrive after finishing secondary school, with a base in mathematics and drawing. The training is taken at a technical institute or a higher education center that offers it, and some ask for an entrance exam or a preparatory course.
In many countries the technician works under the responsibility of a surveyor or engineer with a university degree, and signing official plans or property work usually requires a license or professional registration that a technical qualification does not always give. Those who want to take on that responsibility can continue with university studies in surveying, geomatics or engineering, and sometimes subjects already passed are recognized.
Skills that help
- Measuring carefully and repeating measurements to check that they match.
- Reading plans and understanding how they relate to the real land.
- Using drawing and calculation software to process data.
- Working as a team in the field, with clear communication over distance and with signals.
- Keeping orderly records so that another person can review the work.
- Solving practical problems when the terrain or the weather makes measuring harder.
Career paths and job opportunities
- Construction and civil engineering companies.
- Surveying offices and engineering consultancies.
- Public bodies for land registry, roads, urban planning or public works.
- Mining, oil and energy companies.
- Service companies that work with drones and digital maps.
- Self-employed work, offering surveys and plans.
What you are not always told
- Much of the work is done outdoors, in sun, rain, dust or difficult terrain, and sometimes in remote areas.
- There is a lot of walking and carrying of equipment, so physical effort is part of the routine.
- A small measuring error can carry on into the construction, which is why checking and patience matter more than speed.
- Project deadlines can mean long working hours or traveling for several days.
- At the start, it is common to do support tasks, such as holding the prism or writing down data, before taking on complete measurements.
How the field is changing
Instruments are increasingly automatic: total stations and satellite receivers store the data directly, and drones and laser scanners capture large areas in great detail. This reduces the work of writing things down by hand and increases the work of processing point clouds, digital models and maps with specialized software. The rules on the use of drones and on delivering information in digital formats are also changing, so fieldwork is increasingly combined with data handling.
Want to know if this is the right career for you?
Take the free vocational test with 5 scientific methods — CHASIDE, Holland, Big Five, MMMG and VAK — to get your personalized profile. You can also explore all university careers or learn about the scientific methodology.