What is the job of a Planning Engineer?
The job of a planning engineer consists of organizing a project over time, mostly in construction, industry or energy: which activities have to be done, in what order, how long each one takes and what resources it needs. With that information the planning engineer builds a work schedule that guides the team and makes it possible to check whether the site or the project is going as agreed.
A typical day combines office work with visits to the construction site or the plant. The schedule is updated with real progress and compared with what was planned, and the planning engineer talks with site managers, contractors and purchasing staff to understand what fell behind and why, and prepares reports and meetings. Most of the work is done with planning software and spreadsheets, along with a lot of conversation with other departments.
Typical tasks
- Breaking a project down into activities and defining their sequence and dependencies.
- Estimating the duration and resources of each activity together with the people responsible for the site or for production.
- Building and maintaining the schedule with planning software.
- Recording actual progress and comparing it with the plan to spot delays.
- Proposing adjustments, such as changing the order of tasks or adding crews, when the schedule drifts off course.
- Preparing progress reports for the project management and for the client.
- Analyzing the effect of changes or unexpected events on delivery dates.
Subjects and content usually covered
- Mathematics, statistics and physics, as in most engineering programs.
- Project management: scope, deadlines, costs, risks and communication.
- Scheduling techniques, such as bar charts and the critical path method.
- Construction or industrial processes of the sector where the person works.
- Costs, budgets and cost control.
- Planning software and advanced spreadsheets.
- Contracts, workplace safety and the basics of legislation.
Usual duration and type of training
There is no single route with this name. The usual way is to study a related engineering field, such as civil, industrial, mechanical or electrical engineering, which usually takes 4 to 6 years depending on the country, and then to learn planning on the job. Many people add courses or graduate programs in project management, lasting from about 6 months to 2 years. The length and the names of the qualifications change from one country to another.
How you get there and what is usually required to practice
It is a position people reach from a related engineering field, normally after some time of practice. It is common to start as a planning assistant, a project control assistant or a technical office assistant, and gradually take on responsibility for the schedule.
In many countries no specific license is required to do planning, although the engineering profession itself may require a degree and professional registration to sign certain documents. Skill with planning software, experience on site and, in international companies, a second language usually count as a plus. Some organizations value certifications in project management.
Skills that help
- Putting tasks in a logical sequence and spotting which ones hold up all the others.
- Reading drawings, specifications and progress data from the site or from production.
- Using planning software and spreadsheets with ease.
- Talking with site managers, contractors and suppliers to get reliable information.
- Explaining a delay and its causes clearly, in writing and in meetings.
- Reviewing the schedule regularly and correcting it when reality changes.
Career paths and job opportunities
- Construction companies that build buildings, roads, bridges and infrastructure.
- Energy, mining, and oil and gas projects.
- Industrial plants that plan maintenance shutdowns or expansions.
- Project management consultancies and engineering offices.
- Public bodies and utility companies that commission works.
- Real estate firms and project developers.
What you are not always told
- A project almost never follows its original schedule, and a large part of the work is updating it and explaining why it changed.
- When there are delays, the pressure often falls on the person who keeps the schedule, even if the causes lie in other departments.
- Depending on the project, there may be travel, sites far from the city and long hours close to delivery dates.
- Getting reliable data means following up with other people again and again, which takes patience and persistence.
- The first position is usually a support one, with repetitive updating tasks, before taking charge of a whole schedule.
How the field is changing
Construction schedules are increasingly linked to 3D digital models and to data collected on site, for example with drones, photographs and sensors, which allows actual and planned progress to be compared in more detail. Some tools simulate scenarios and suggest alternative sequences, so part of the work is moving from building the schedule to reviewing it and analyzing its risks. Collaborative planning methods, in which the site teams themselves take part in the schedule, are also gaining ground.