What is the job of a Scheduler?
The job of a scheduler consists of building and maintaining the timeline of a construction project: deciding in what order the activities are done, how long each one takes and what must be finished before the next one can start. It helps the people who run the site know what is expected each week and notice in time if something is falling behind.
A typical day is spent mostly at a computer, with visits to the site depending on the case. The real progress is updated with the information that comes in from the site, compared with the plan, and a check is made of which activities have slipped and which others are affected. Then reports are prepared, and the scheduler talks with site managers, engineers, purchasing staff and subcontractors to adjust dates and organize the work of the coming weeks.
Typical tasks
- Breaking the project down into activities and defining the sequence in which they must be done.
- Estimating the duration of each activity together with the site team.
- Building the schedule in a planning program and keeping it up to date.
- Recording the actual progress and comparing it with the plan.
- Identifying the activities that, if they fall behind, delay the whole project.
- Preparing progress reports and presenting alternatives when there are delays.
- Planning the immediate work week by week with site managers and subcontractors.
Subjects and content usually covered
- Construction basics: stages of a building project, structures, installations and finishes.
- Reading drawings and technical specifications.
- Project planning: the critical path method and bar charts.
- Project planning software and spreadsheets.
- Measurements and quantities of work, and the output rates of crews and machinery.
- Basics of construction costs and budgets.
- Contract management, risk and progress control.
Usual duration and type of training
There is no single training route. People who come through university usually study for 4 to 5 years in a field such as civil engineering, architecture or construction. Those who come through a technical route usually study for 2 to 3 years. After that, people usually add experience on site, and short planning courses of 2 to 12 months. All of this varies by country and by institution.
How you get there and what is usually required to practice
This is a job that people reach by several paths. The most common is to study civil engineering, architecture, construction or a related technical program, and to start as an assistant in planning, site control or the technical office. Another path is to work on site first, as a site engineer or assistant, and move into planning after learning well how the work is carried out.
In general no specific professional license is required to do scheduling, although in some countries a registration is needed to sign off on or direct construction work. Skills that are usually valued include command of a planning program, reading drawings and, in companies with international projects, English. First positions are usually support roles, and independence comes with experience.
Skills that help
- Putting the activities of a construction project into a logical sequence.
- Estimating times realistically, drawing on what the people doing the work say.
- Using planning programs and spreadsheets with ease.
- Reading drawings and understanding what each activity involves on site.
- Explaining clearly to non-technical people why a date has changed.
- Negotiating deadlines with site managers, suppliers and subcontractors.
Career paths and job opportunities
- Construction companies working on buildings, housing and infrastructure.
- Project management or supervision firms.
- Engineering offices and planning consultancies.
- Real estate development companies.
- Industrial, mining or energy projects.
- Public agencies that contract and oversee construction work.
What you are not always told
- A schedule is almost never followed exactly as written: rain, late deliveries and design changes force it to be redone often.
- When there are delays, it is usually the scheduler who has to explain them, even when the cause lies with other departments.
- Much of the work is done in front of a screen, with peaks of pressure before report deadlines or meetings with the client.
- Part of the job is getting reliable data from people who are busy on site, which takes persistence and good manners.
- The first job is usually as an assistant, with repetitive updating tasks, before designing full schedules.
How the field is changing
Digital building models (BIM) make it possible to link the schedule to the model and see how construction will progress. Drones, site photographs and phone apps make it easier to collect progress data with less paper, and some programs already suggest sequences or simulate delay scenarios. This reduces manual data entry and puts more weight on interpreting the data and deciding together with the site team.