What is the job of a Cost Engineer?
The job of a cost engineer consists of calculating how much a project will cost, tracking how much is spent while it is carried out, and warning when the numbers drift away from what was planned. It is found mostly in construction, industrial plants, mining, energy and manufacturing projects, where many materials, pieces of equipment, contractors and hours of work have to be organized and controlled.
A typical day mixes office work and coordination. Invoices and progress reported by contractors are reviewed and compared with the budget, spreadsheets or the management system are updated, and reports are prepared for the project management. Questions also come in from the engineering, purchasing and contracts teams about changes that affect the cost, and sometimes the site or the plant is visited to better understand what is being paid for.
Typical tasks
- Preparing a project's initial budget from drawings, material quantities and supplier prices.
- Regularly comparing what has been spent with what was budgeted and explaining the differences.
- Calculating the effect on cost of the scope or design changes requested during construction.
- Reviewing contractors' payment claims and invoices and checking that they match the work actually done.
- Estimating how much it will cost to finish the project based on what has already been spent and what remains.
- Writing cost reports for the project management and for the client.
- Keeping the database of prices and past projects in order so it can be used in future estimates.
Subjects and content usually covered
- Mathematics, statistics and the fundamentals of engineering.
- Engineering economics and financial mathematics.
- Cost estimating and unit price analysis.
- Project management, planning and progress control.
- Contracts, purchasing and contractor administration.
- Basic accounting and industrial costs.
- Spreadsheets, budgeting software and enterprise management systems.
Usual duration and type of training
Because people reach this job from another career, there is no single length. The underlying engineering degree, for example civil, industrial, mechanical or chemical, usually takes 4 to 6 years depending on the country and the university. After that, the trade is usually learned on the job over several years, starting as an assistant or analyst. Many people add courses or graduate programs in project management or cost management, lasting from 3 months to 2 years, which are optional and vary from one country to another.
How you get there and what is usually required to practice
The most common route is to study a related engineering field, such as civil, industrial, mechanical, chemical, mining or electrical, and start in a support position: cost assistant, budget analyst or work in the technical office of a construction site. People also arrive from project engineering, planning or purchasing.
In general no specific license is required for this job, although in many countries an engineering degree does need a professional registration in order to sign certain documents. Companies usually value skill with spreadsheets and budgeting software and, in international projects, a second language such as English. There are private certifications in cost estimating and cost control that some companies take into account, but they are not mandatory.
Skills that help
- Analyzing data and finding out why a figure does not add up.
- Reading drawings and technical specifications to take off quantities.
- Using spreadsheets and budgeting software with ease.
- Explaining a cost difference, in writing and out loud, to people who are not technical.
- Negotiating and clarifying prices with suppliers and contractors.
- Keeping documents and the versions of each budget orderly and traceable.
Career paths and job opportunities
- Construction and engineering companies that carry out civil works, buildings or infrastructure.
- Companies running industrial projects in oil, gas, energy or mining.
- Manufacturing plants that control production or investment costs.
- Project management and cost consulting firms.
- Offices of public bodies that contract and supervise works.
- Companies that own large assets, such as utilities or telecommunications firms, and manage their own projects.
What you are not always told
- Much of the time is spent in front of a computer, with spreadsheets and documents, rather than out on site.
- When a project goes over budget, the cost team is often the one that has to give the news and explain the causes.
- Month-end or stage-end closings bring weeks of heavier workload and tight deadlines.
- An estimate is never exact: working with uncertainty and accepting that it is corrected often is part of the job.
- The first job is usually a support role with repetitive tasks, and responsibility for important figures comes gradually.
How the field is changing
Budgets rely more and more on digital models of the construction, from which quantities can be pulled automatically, and on software that brings together data from purchasing, progress and invoicing. This reduces the manual work of copying figures and leaves more time to review assumptions and analyze deviations. Tools that use data from earlier projects to compare prices are also being used. Sustainability rules and the measurement of emissions add new items that sometimes have to be included in the cost calculation.