What is the job of a Planning and Scheduling Engineer?
The job of a planning and scheduling engineer consists of defining in what order, for how long and with what resources each part of a project will be done, and of watching that actual progress stays close to the plan. It is found mostly in construction, industrial plants, mining, energy and infrastructure projects, where hundreds or thousands of activities depend on one another. People usually reach this position from a related engineering degree.
A typical day combines work on the schedule with conversations with other departments. Progress is updated with the information sent by the site, purchasing or engineering teams, the activities that fell behind are reviewed along with the others they affect, and a report is prepared for project management. Alternatives are also simulated, for example what happens if a piece of equipment arrives late or if a work crew is added, and those options are explained in progress meetings.
Typical tasks
- Building the project schedule from the scope, dividing it into activities and defining which ones depend on which.
- Estimating the duration and resources of each activity together with the engineering, purchasing and construction teams.
- Updating actual progress with the data received and comparing it with what was planned.
- Identifying the critical path, that is, the chain of activities that determines the final date of the project.
- Analyzing delays and proposing ways to recover them, such as changing the order of tasks or adding resources.
- Preparing progress reports and charts for management and the client.
- Reviewing the impact of scope changes on deadlines and documenting it.
Subjects and content usually covered
- Mathematics, statistics and physics as taught in engineering.
- Project management: scope, deadlines, costs and risks.
- Scheduling techniques for construction work, such as the critical path method and bar charts.
- Project planning software and advanced spreadsheets.
- Construction or production processes of the engineering field the person comes from.
- Costs and progress control, including the measurement of physical progress.
- Contracts and change management in projects.
- Data analysis and presentation of information.
Usual duration and type of training
In most countries this is not a degree with that name but a job reached after a related engineering degree, such as civil, industrial, mechanical, electrical or mining engineering. Those degrees usually last 4 to 6 years, depending on the country and the university. After that, people usually add several years of practice on projects and, sometimes, project management courses or graduate programs lasting 3 to 12 months. The timelines and the names of the qualifications vary a lot from one country to another.
How you get there and what is usually required to practice
The most common way in is to study a related engineering degree and start on a project as an assistant or junior planning engineer, or to move into this function from site work, project engineering or project controls. Knowing how the work is carried out in the field helps in estimating more realistic times.
In general no specific license is required for this position, although in several countries an engineering degree has to be registered in order to practice. Many companies value skill with planning software and project management certifications offered by professional associations, which usually ask for previous experience and passing an exam.
Skills that help
- Breaking a large project into small activities and putting them in a logical order.
- Reading drawings, bills of materials and scopes of work to understand how much work each part involves.
- Using spreadsheets and scheduling software fluently.
- Interpreting progress data and spotting deviations before they grow.
- Explaining a delay and its consequences clearly to people with different backgrounds.
- Negotiating deadlines with site, purchasing and engineering teams.
Career paths and job opportunities
- Construction companies and civil works contractors.
- Engineering, procurement and construction firms that build industrial plants.
- Mining, oil, gas and energy companies.
- Infrastructure companies, such as those working on roads, ports and power grids.
- Project management and project controls consultancies.
- Project departments in factories and industrial companies.
What you are not always told
- The work depends on information provided by other people, and it sometimes arrives late, incomplete or with errors that have to be corrected.
- When a project falls behind, the person who does the scheduling is often the one who has to give the news, and it is not always well received.
- Part of the day is spent at a computer, but there are also frequent meetings and, on some projects, visits to construction sites or remote camps.
- Before delivery dates or monthly reports, the workload and the hours can go up.
- The first job is usually a support role, with repetitive updating tasks, and responsibility for the whole schedule comes with experience.
How the field is changing
Planning software is increasingly connected to site data collected with drones, sensors and mobile apps, which makes it possible to measure progress with less manual work. Three-dimensional digital models are used to link the schedule to the design, along with analysis tools that simulate scenarios or point out risks of delay. This reduces the effort of entering data and gives more weight to analysis and to communication with the team.